Engineering company Leidos won a contract from Magellan Midstream Partners LP to provide engineering, procurement and construction (EPC) services for a condensate splitter at Magellan’s Corpus Christi, Texas, processing and storage terminal.
The condensate splitter is scheduled to enter service in the second half of 2016. It has an expected processing capacity of up to 50,000 barrels per day (bbl/d) of Eagle Ford condensate received from the Double Eagle Pipeline.
Under the contract, Leidos will use its DesignBuild services to design and install the single processing train. The design includes an allowance for a potential second train to increase production output to 100,000 bbl/d. Leidos will work with Saulsbury Industries on the splitter’s construction.
Recommended Reading
Tellurian Reports Driftwood LNG Progress Amid Low NatGas Production
2024-05-02 - Tellurian’s Driftwood LNG received an extension through 2029 with authorization from the Federal Energy Regulatory Commission and the U.S. Army Corps of Engineers.
Zeta Energy Appoints Michael Everett as COO
2024-05-02 - Prior to joining Zeta Energy, a lithium-sulfur battery developer, Michael Everett previously served as president and COO at Advanced Battery Concepts.
Shell Launches $3.5 Billion Share Buyback Program
2024-05-02 - Shell, which posted first-quarter adjusted earnings of $7.7 billion, will cancel all of the shares it buys.
Supply Disruptions Ahead as Canadian Rail Workers Vote for Strike
2024-05-01 - The union, representing more than 9,000 employees at Canadian National Railway and Canadian Pacific Kansas City, announced that 95% of its members approved of a strike, which could happen as early as May 22.
Patterson-UTI Braces for Activity ‘Pause’ After E&P Consolidations
2024-02-19 - Patterson-UTI saw net income rebound from 2022 and CEO Andy Hendricks says the company is well positioned following a wave of E&P consolidations that may slow activity.