Honeywell Process Solutions (HPS) was selected to handle critical project management and engineering for a third oil and gas platform off the coast of Vietnam.
Hoang Long Joint Operating Co. will operate the TGT-H5 wellhead platform in the Te Giac Trang (TGT) Field off the southern coast of Vietnam. HPS was the main contractor and provided control and safety solutions for Hoang Long’s two other platforms that operate in the TGT Field.
Along with turnkey project management and engineering of the new platform’s topside structures, HPS will install an integrated Honeywell control and safety solution, including a new fire and gas system, to improve automation, increase cyber and physical security and improve operator effectiveness. TGT-H5 plans to begin production in the fourth quarter. Total production from the three platforms is expected to be about 50,000 barrels of crude oil per day.
The new contract includes engineering management and integration with the two existing TGT platforms, the FPSO vessel that processes the hydrocarbons produced by the platforms and remote monitoring from the Hoang Long office in Ho Chi Minh City. Specific technology to be used on the H5 platform includes Experion PKS, C300 Controller and Safety Manager.
Recommended Reading
US Oil, Gas Rig Count Falls to Lowest Since January 2022
2024-05-03 - The oil and gas rig count, an early indicator of future output, fell by eight to 605 in the week to May 3, in the biggest weekly decline since September 2023.
Pemex Reports Lower 2Q Production and Net Income
2024-05-03 - Mexico’s Pemex reported both lower oil and gas production and a 91% drop in net income in first-quarter 2024, but the company also reduced its total debt to $101.5 billion, executives said during an earnings webcast with analysts.
Chouest Acquires ROV Company ROVOP to Expand Subsea Capabilities
2024-05-02 - With the acquisition of ROVOP, Chouest will have a fleet of more than 100 ROVs.
SLB, OneSubsea, Subsea 7 Sign Collaboration Deal with Equinor
2024-05-02 - Work is expected to begin immediately on Equinor’s Wisting and Bay Du Nord projects.
SilverBow Makes Horseshoe Lateral in Austin Chalk
2024-05-01 - SilverBow Resources’ 8,900-foot lateral was drilled in Live Oak County at the intersection of South Texas’ oil and condensate phases. It's a first in the Chalk.