EE3 LLC reported the highest 24-hour initial production rate of a horizontal Niobrara well drilled in the North Park Basin, the company said in a press release Oct. 14.
The Hebron #3-12H flowed 1,054 barrels of oil in a 24-hour test period, with 400 pounds per square inch flowing casing pressure on a 48/64th-inch choke. The well was drilled to 6,388 vertical feet before being completed with a 4,100 foot lateral in the Niobrara D bench. The well was completed with 19 stages of the plug and perforation process using a total of 3.9 million pounds of sand.
The Hebron #3-12H is located in Section 12, Township 7 North, Range 81 West of Jackson County, Colo., in the center part of the North Park Basin. EE3 LLC holds a 100% working interest in the well.
EE3 LLC is an independent oil and gas exploration and production company headquartered in Boulder, Colo.
Recommended Reading
US Oil, Gas Rig Count Falls to Lowest Since January 2022
2024-05-03 - The oil and gas rig count, an early indicator of future output, fell by eight to 605 in the week to May 3, in the biggest weekly decline since September 2023.
Pemex Reports Lower 2Q Production and Net Income
2024-05-03 - Mexico’s Pemex reported both lower oil and gas production and a 91% drop in net income in first-quarter 2024, but the company also reduced its total debt to $101.5 billion, executives said during an earnings webcast with analysts.
Chouest Acquires ROV Company ROVOP to Expand Subsea Capabilities
2024-05-02 - With the acquisition of ROVOP, Chouest will have a fleet of more than 100 ROVs.
SLB, OneSubsea, Subsea 7 Sign Collaboration Deal with Equinor
2024-05-02 - Work is expected to begin immediately on Equinor’s Wisting and Bay Du Nord projects.
SilverBow Makes Horseshoe Lateral in Austin Chalk
2024-05-01 - SilverBow Resources’ 8,900-foot lateral was drilled in Live Oak County at the intersection of South Texas’ oil and condensate phases. It's a first in the Chalk.