Three Spraberry Producers Completed at Upton County, Texas, Pad

Drilling Activity Details

Locations

Upton
TX
United States

Operators
Post Date
Shore Type
Well Name
#0124SH Davidson Unit 1, #0145SH Davidson Unit 1, #0144SH Davidson Unit 1
Geo Coordinate

Drilling Activity Summary

Description

XTO Energy Inc. completed three Spraberry producers in Texas’ Upton County (RRC Dist. 7C). The wells were completed from a pad in Section 37, Block 40, T&P RR CO Survey, A-1356. The #0124SH Davidson Unit 1 was drilled to 20,880 ft, 8,935 ft true vertical. It produced 328 bbl of 41° API oil, 575,000 cu ft of gas and no reported water per day from perforations at 10,454-20,716 ft. The #0145SH Davidson Unit 1 was drilled to 20,675 ft, 8,734 ft true vertical. It was tested flowing 902 bbl of 41° API oil with 1.127 MMcf of gas and no reported water per day. Production is from perforations at 10,228-20,545 ft. The #0144SH Davidson Unit 1 initially flowed 728 bbl of 41° API oil, 1.129 MMcf of gas and not reported water per day. It was drilled to 20,673 ft with a true vertical depth of 8,750 ft and production is from perforations at 10,223-20,497 ft. XTO is a subsidiary of Exxon Mobil.