Tejas Field-Frio Gas Well Produces 598 Mcf Per Day

Drilling Activity Details

Locations

Goliad
TX
United States

Post Date
Shore Type
Well Name
#1 Clarkson
Geo Coordinate

Drilling Activity Summary

Description

Results from a Frio gas well in Goliad County (RRC Dist. 2), Texas, were announced by Charro Operating. The #1 Clarkson flowed 598 Mcf of gas per day from perforations at 4,771-79 ft. Gauged on an 8/64-in. choke, the flowing tubing pressure was 1,504 psi, and the shut-in tubing pressure was 1,745 psi. The 5,650-ft Tejas Field well was drilled on a 150-acre Central Texas Coast lease in Michael O’Donnell Survey, A-30. Charro is based in Refugio, Texas. O’Donnell Survey, A-30. Charro is based in Refugio, Texas.