Niobrara Completion Tested Flowing 518 bo, 201 Mcf Of Gas Per Day
Drilling Activity Details
CO
United States
Drilling Activity Summary
Description
Noble Energy Inc. has reported a horizontal Niobrara completion in the Denver-Julesburg Basin. According to IHS Markit, #27LC-785 Jessica is in Section 34-9n-59w of Weld County, Colo. It initially flowed 518 bbl of 42-degree-gravity oil, 201 Mcf of gas and 523 bbl of water per day. Production is from a horizontal Niobrara lateral extending from 6,518 ft northward to 11,520 ft with a bottomhole location in Section 27-9n-59w. The true vertical depth is 6,057 ft. It was tested on a 22/64-in. choke following 21-stage fracturing between 6,518 and 11,503 ft. Noble’s headquarters are in Houston.
Noble Energy Inc. has reported a horizontal Niobrara completion in the Denver-Julesburg Basin. According to IHS Markit, #27LC-785 Jessica is in Section 34-9n-59w of Weld County, Colo. It initially flowed 518 bbl of 42-degree-gravity oil, 201 Mcf of gas and 523 bbl of water per day. Production is from a horizontal Niobrara lateral extending from 6,518 ft northward to 11,520 ft with a bottomhole location in Section 27-9n-59w. The true vertical depth is 6,057 ft. It was tested on a 22/64-in. choke following 21-stage fracturing between 6,518 and 11,503 ft. Noble’s headquarters are in Houston.