Directional Wind River Basin Delineation Test Produces From Multiple Zones

Drilling Activity Details

Locations

Fremont
WY
United States

Plays
Post Date
Shore Type
Well Name
#26-13 PKU (Powder Keg Unit)
Geo Coordinate

Drilling Activity Summary

Description

IHS Markit reported that Aethon Energy Operating LLC completed a directional delineation test on the northern flank of the Wind River Basin that flowed 4.006 MMcf of gas and 4.147 Mbbl of water per day. The Fremont County, Wyo., well, #26-13 PKU (Powder Keg Unit), is in Section 26-37n-91w and was drilled to the northwest to 11,135 ft (10,965 ft true vertical). It was tested on a 56/64-in. choke after 15-stage fracturing between 7,598 and 11,033 ft. Production is from Fort Union between 7,598 and 9,592 ft and Lance between 9,628 and 11,033 ft. Aethon’s headquarters are in Dallas.