Blackbrush Announced Results From Three Olmos Wells
Drilling Activity Details
TX
United States
Drilling Activity Summary
Description
In the western McMullen County (RRC Dist. 1), Texas, portion of AWP Field, Blackbrush Oil & Gas LP completed three Olmos oil wells from a common pad. The discoveries are on a 4,258-acre Southwest Texas lease in Section 4, GB&CNG RR Co Survey, A-605, and bottomed in Section 46, CCSD&RGNG RR Co Survey, A-1131. The #1605H STS flowed 567 bbl of 46.3-degree-gravity crude, 1.263 MMcf of gas and 653 bbl of water per day through acid- and fracture-treated perforations at 9,315-13,475 ft. Gauged on a 15/64-in. choke, the flowing tubing pressure was 1,650 psi and the flowing casing pressure was 580 psi. The 13,612-ft well has a true vertical depth of 8,856 ft and bottomed 1 mile to the north. The #2605H STS flowed 475 bbl of 46.3-degree-gravity crude, 1.109 MMcf of gas and 631 bbl of water per day from perforations at 9,260-13,092 ft. The total depth is 13,228 ft and the true vertical depth is 8,872 ft. The #3605H STS flowed 755 bbl of crude, 1 MMcf of gas and 538 bbl of water per day. It was drilled to 14,610 ft, 8,833 ft true vertical, and production is from perforations at 9,260-13,092 ft. Blackbrush’s headquarters are in San Antonio.
In the western McMullen County (RRC Dist. 1), Texas, portion of AWP Field, Blackbrush Oil & Gas LP completed three Olmos oil wells from a common pad. The discoveries are on a 4,258-acre Southwest Texas lease in Section 4, GB&CNG RR Co Survey, A-605, and bottomed in Section 46, CCSD&RGNG RR Co Survey, A-1131. The #1605H STS flowed 567 bbl of 46.3-degree-gravity crude, 1.263 MMcf of gas and 653 bbl of water per day through acid- and fracture-treated perforations at 9,315-13,475 ft. Gauged on a 15/64-in. choke, the flowing tubing pressure was 1,650 psi and the flowing casing pressure was 580 psi. The 13,612-ft well has a true vertical depth of 8,856 ft and bottomed 1 mile to the north. The #2605H STS flowed 475 bbl of 46.3-degree-gravity crude, 1.109 MMcf of gas and 631 bbl of water per day from perforations at 9,260-13,092 ft. The total depth is 13,228 ft and the true vertical depth is 8,872 ft. The #3605H STS flowed 755 bbl of crude, 1 MMcf of gas and 538 bbl of water per day. It was drilled to 14,610 ft, 8,833 ft true vertical, and production is from perforations at 9,260-13,092 ft. Blackbrush’s headquarters are in San Antonio.