API has published the ninth edition of API Standard 2510, covering the design, construction, and location of LPG storage installations and handling facilities, the company said on Aug. 12.
API 2510, titled “Design and Construction of LPG Installations”, covers a broad array of LPG facilities, including both marine and onshore pipeline terminals, natural gas processing plants, refineries, petrochemical plants, and tank farms.
The ninth edition makes a key change when compared to its previous version by incorporating API 625, covering refrigerated tank storage systems with general requirements to address issues common to all tank systems in an integrated way. The ninth edition provides updated requirements for storage design, associated piping systems, foundation requirements, and accessories. The standard also recommends various materials to be considered by operators to strengthen LPG facilities, including reinforced masonry, reinforced concrete, prestressed concrete, metal plate, and pipe of various shapes and sizes.
The revisions to API 2510 help address the safety of LPG storage installations by employing good engineering practices during both the design and construction of these facilities. Likewise, environmental protection is also addressed by employing the standard’s expanded guidance for fire protection, as well as requirements for spill containment and pressure relief.
LPG facilities are designed to handle a number of hydrocarbon liquids that are produced from natural gas wells, including propane, butane, kerosene, and other related liquids. In fact, LPG is the second most widely used fuel for heating in the United States after natural gas, and is also commonly used for air conditioning and as a chemical refrigerant. Given the essential nature of LPG in everyday life, it is important that its storage and handling reflect industry best practices and design considerations.
API 2510 has been published by API’s Global Industry Services (GIS) division and is made available at API Publications. Please contact us at Standards@api.org for further information or questions.
Recommended Reading
The US Shale Rig Count is Not Falling, Data Show
2025-07-01 - The net change in the U.S. horizontal rig count is seven rigs—1% —fewer than at year-end 2024, a Hart Energy analysis shows. Instead, the sub-$70 oil price has displaced rigs targeting non-shale targets.
Powder River E&Ps Target New Zones as Oil Prices Threaten Growth
2025-05-30 - Powder River Basin E&Ps are turning to 3-mile laterals and untapped zones to improve the play’s economics. But with oil prices at $60/bbl and superior returns elsewhere, Wyoming must keep fighting for relevancy.
EOG Secures Award to Explore Abu Dhabi for Unconventional Oil
2025-05-16 - U.S. shale giant EOG Resources will evaluate 900,000 acres in a hydrocarbon-rich basin in Abu Dhabi under a new concession agreement with ADNOC.
Anschutz Charges Ahead with 3-Mile Powder River Laterals
2025-06-25 - Anschutz Exploration Corp., the leading Powder River Basin developer and Wyoming’s top oil producer, is drilling its first 3-mile laterals on a pad in Johnson County, Wyoming.
Blackbeard Horizontals Spark New Life in Permian’s Central Basin
2025-06-18 - Blackbeard’s treasure is buried beneath the Permian’s Central Basin Platform. While oil majors chase deeper waters, the Blackbeard crew is applying horizontal drilling to West Texas’ forgotten frontier.