The following information is provided by EnergyNet. All inquiries on the following listings should be directed to EnergyNet. Hart Energy is not a brokerage firm and does not endorse or facilitate any transactions.
Anschutz Exploration Corp. has retained EnergyNet for the sale of six AFE asset packages in Campbell County, Wyoming. The package includes 80 offset permits and 331 active offset operators.
Opportunity highlights:
Projected formation: Niobara
- Operator: EOG Resources, Inc.
- 80 Offset Permits
- New Drill: 18 Completed | 15 Confidential | 12 DUC/Drilled | 29 Permitted
- Amended: 3 Completed
- Re-Enter: 1 Drilled | 2 Permitted
- 331 Active Offset Producers
Select Offset Operators: Ballard Petroleum Holdings LLC; EOG Resources, Inc.; Peak Powder River Resources LLC
Projected formation: Parkman
- Operator: EOG Resources, Inc.
- 80 Offset Permits
- New Drill: 18 Completed | 15 Confidential | 12 DUC/Drilled | 29 Permitted
- Amended: 3 Completed
- Re-Enter: 1 Drilled | 2 Permitted
- 331 Active Offset Producers
Select Offset Operators: Ballard Petroleum Holdings LLC; EOG Resources, Inc.; Peak Powder River Resources LLC
All bids are due March 1 at 4 p.m. CST. For complete due diligence, please visit energynet.com, or email Reilly Bliton, director, at Reilly.Bliton@energynet.com.
Recommended Reading
Seatrium Awarded Contract for FPSO Bound for Guyana’s Stabroek
2024-05-17 - The topsides fabrication and integration contract will be for the FPSO Jaguar, bound for the Whiptail Field in the Stabroek block offshore Guyana for Exxon Mobil.
Third Suriname Find for Petronas, Exxon Could Support 100,000 bbl/d FPSO
2024-05-17 - A recent find offshore Suriname in Block 52 by Petronas and Exxon Mobil could support a 100,000 bbl/d FPSO development, according to Wood Mackenzie.
US Drillers Add Oil, Gas Rigs for First Time in Four Weeks: Baker Hughes
2024-05-17 - The oil and gas rig count rose by one to 604 in the week to May 17.
BPX Looks to Ramp US Production Over 60% by 2030
2024-05-16 - BPX Energy is looking to boost its U.S. production over 60% by 2030 as it considers bringing online a fourth processing facility in the Permian by mid-year 2025, Clark Edwards, the company’s vice president of development, said during SUPER DUG in Fort Worth.
Empire Petroleum’s Williston Drilling Program Identifies New Zones
2024-05-16 - Empire Petroleum provided updates on its Williston Basin development drilling program in its first quarter 2024 earnings results.