Crude oil production at the Cano Limon Field, operated by U.S.-based Occidental Petroleum Corp. (NYSE: OXY) in northern Colombia, is being gradually suspended after an escalation of rebel attacks on its pipeline, military and oil industry sources said March 1.
The Cano Limon-Covenas Pipeline, which transports crude from the fields to a port in the Caribbean Sea for export, has been suspended since Feb. 15 because of a series of bomb attacks attributed by the military to the National Liberation Army (ELN), a Marxist rebel group.
"At the moment 44 of 370 wells are reported shut down, storage capacity is at its peak," a senior military official, who asked not to be named, told Reuters.
Occidental did not immediately respond to calls in Colombia from Reuters.
The Cano Limon deposit, in Arauca province near the border with Venezuela, produces around 50,000 barrels per day (Mbbl/d). The 780 km (485-mile) pipeline can carry up to 210 Mbbl/d.
Attacks by the ELN on oil infrastructure have been frequent during the group's five-decade war with the government. This year there have been 17 attacks on the pipeline and there were 43 last year, causing oil spills and environmental damage.
Colombia's conflict, which pits government troops against the ELN, the Revolutionary Armed Forces of Colombia (FARC) and right-wing paramilitary groups, has killed more than 220,000 people and displaced millions.
In February, President Juan Manuel Santos and the ELN launched formal peace negotiations in Ecuador, but the group has stepped up its attacks since. The group claimed responsibility for a bomb attack in Bogota last month that injured dozens of police officers.
The ELN has about 2,000 combatants and opposes the presence of multinational companies in the mining and oil sector, claiming that they seize natural resources without leaving benefits to the country's population or economy.
The FARC, the biggest rebel group in the South American country, agreed to a peace accord with the government late last year.
Recommended Reading
TotalEnergies Starts Production at Akpo West Offshore Nigeria
2024-02-07 - Subsea tieback expected to add 14,000 bbl/d of condensate by mid-year, and up to 4 MMcm/d of gas by 2028.
CNOOC’s Suizhong 36-1/Luda 5-2 Starts Production Offshore China
2024-02-05 - CNOOC plans 118 development wells in the shallow water project in the Bohai Sea — the largest secondary development and adjustment project offshore China.
Equinor Receives Significant Discovery License from C-NLOPB
2024-02-02 - C-NLOPB estimates recoverable reserves from Equinor’s Cambriol discovery at 340 MMbbl.
Oceaneering Won $200MM in Manufactured Products Contracts in Q4 2023
2024-02-05 - The revenues from Oceaneering International’s manufactured products contracts range in value from less than $10 million to greater than $100 million.
Seadrill Awarded $97.5 Million in Drillship Contracts
2024-01-30 - Seadrill will also resume management services for its West Auriga drillship earlier than anticipated.