Maersk Supply Service has been selected to deliver an integrated FPSO mooring installation and replacement solution for an American oil major in the Gulf of Guinea, the company said on April 25.
Maersk Supply Service will provide the full work scope from project management to execution.
Responsibilities undertaken as part of the project include engineering, procurement, transportation of mooring equipment, safety management and offshore execution using four of Maersk Supply Service’ large anchor handling vessels as well as ROV and survey services. Maersk Supply Service has partnered with InterMoor, who will support the project with their expertise within engineering, design and offshore execution of mooring system operations.
“As the project lead of this FPSO mooring installation, we look forward to further strengthening our position in the market as a preferred solutions provider,” Steen S. Karstensen, Maersk CEO, said.
The project will be led from Maersk Supply Service’s office in Aberdeen, with an integrated project team supporting from Houston. The planning and engineering work commences immediately, with offshore execution expected to take place during fourth-quarter 2019.
Recommended Reading
Stena Evolution Upgrade Planned for Sparta Ops
2024-03-27 - The seventh-gen drillship will be upgraded with a 20,000-psi equipment package starting in 2026.
E&P Highlights: Jan. 12, 2024
2024-01-15 - Here’s a roundup of the latest E&P headlines, including an SLB-Nabors collaboration and new contract awards.
Tech Trends: Halliburton’s Carbon Capturing Cement Solution
2024-02-20 - Halliburton’s new CorrosaLock cement solution provides chemical resistance to CO2 and minimizes the impact of cyclic loading on the cement barrier.
Tech Trends: SLB's Autonomous Tech Used for Drilling Operations
2024-02-06 - SLB says autonomous drilling operations increased ROP at a deepwater field offshore Brazil by 60% over the course of a five-well program.
Trio Petroleum to Restart McCool Ranch Oilfield
2024-01-07 - California’s Trio Petroleum plans to restart oilfield production at McCool Ranch, where six wells that previously reached a production peak of 400 bbl/d.