Bossier Parish, La., will host a wildcat planned by Berkshire Operating LLC, Dallas. The #1 Bolinger 10 will be drilled to 12,500 ft. in Section 10-22n-12w, about a half-mile southwest of the only other well drilled in the section. The previous well went only to 3,300 ft. The nearest, deeper production is 1.5 miles south in Rocky Mount Field in Section 27. There, #1 W.H. Ford Jr. tested 1.05 million cu. ft. of gas and three bbl. of condensate a day from perforations between 11,482 and 11,601 ft.