Basic Energy Services Inc. said July 18 that one of its high-spec, 24-hour rig and equipment packages recently completed a record-setting Wolfcamp A well for Surge Energy US Holdings Co. in the Permian Basin.
Rig #1826, based in Big Spring, Texas, along with a bundled Basic high-spec ancillary equipment package successfully drilled out frac plugs over a total horizontal displacement of 17,935 ft (3.4 miles). To date, this well marks the longest known lateral completed in the Permian Basin.
The rig, a high-spec, 600-horsepower Taylor well servicing unit, coupled with Basic’s twin 2,250 horsepower pumps and high-performance ancillary equipment, completed the drill-out of the Medusa Unit C 28-09 3AH safely and efficiently in six days.
Recommended Reading
Rhino Taps Halliburton for Namibia Well Work
2024-04-24 - Halliburton’s deepwater integrated multi-well construction contract for a block in the Orange Basin starts later this year.
Halliburton’s Low-key M&A Strategy Remains Unchanged
2024-04-23 - Halliburton CEO Jeff Miller says expected organic growth generates more shareholder value than following consolidation trends, such as chief rival SLB’s plans to buy ChampionX.
Deepwater Roundup 2024: Americas
2024-04-23 - The final part of Hart Energy E&P’s Deepwater Roundup focuses on projects coming online in the Americas from 2023 until the end of the decade.
Ohio Utica’s Ascent Resources Credit Rep Rises on Production, Cash Flow
2024-04-23 - Ascent Resources received a positive outlook from Fitch Ratings as the company has grown into Ohio’s No. 1 gas and No. 2 Utica oil producer, according to state data.
E&P Highlights: April 22, 2024
2024-04-22 - Here’s a roundup of the latest E&P headlines, including a standardization MoU and new contract awards.