Aramco will develop DrillCAM, a real-time seismic while drilling system, in a partnership with technology company Wireless Seismic Inc. (WSI), a press release announced on Aug. 24.
The system, aiming to decrease drilling cycle times and cost while improving operational safety, will deliver a stream of intelligence in real time during the drilling process. The DrillCAM will monitor equipment health and subsurface model accuracy, as well as provide imaging ahead of the drill bit.
“The repurposing of WSI’s wireless linear mesh technology will allow us to quickly productize and commercialize the DrillCAM suite of applications and provide better, faster, safer and more cost-effective information during the drilling process,” WSI CEO Jim Hollis commented in the release.
The companies have already conducted positive field trials thanks to WSI's core seismic acquisition technology, which is able to transmit large amounts of data in complex physical environments, the press release stated.
Companies will be able to deploy the DrillCAM through a commercial offering from the joint development.
Recommended Reading
Matador Resources to Bolt-on Delaware Basin’s Advance Energy in $1.6 Billion Deal
2023-01-24 - Matador said the deal to purchase Advance Energy, an EnCap-backed company, will not increase its leverage and adds more than 200 net drilling locations in the northern Delaware.
ProPetro’s Low-Carbon Future Still Begins and Ends in the Permian
2023-01-17 - Following some A&D in 2022, the Permian-focused oilfield service company is shifting its mindset from aggressive growth to sustainability.
State of Shale 2023, Eagle Ford: A Return to the Spotlight
2022-12-28 - South Texas’ Eagle Ford Shale began showing signs of a resurgence, particularly as it became a hotspot for M&A in 2022.
State of Shale 2023, Barnett: A Star is Reborn
2022-12-27 - Led by operator BKV Corp., the Barnett is getting a makeover as older wells are recompleted using modern refracturing techniques.
State of Shale 2023, Haynesville: A Slumbering Giant?
2022-12-22 - Despite a seemingly quiet year, the Haynesville saw a 54% increase in rig activity, reaching 72 in mid-December.