Learn more about Hart Energy Conferences
Get our latest conference schedules, updates and insights straight to your inbox.
Russian gas deliveries to Europe through Ukraine fell on the morning of April 19 in line with customer requests, while flows to Germany through Nord Stream 1 were steady and increased eastbound into Poland from Germany through the Russia-EU Yamal pipeline.
Daily nominations for Russian gas deliveries to Slovakia via Ukraine fell on April 19, data from Slovakian operator TSO Eustream showed.
Nominations via the Velke Kapusany border point were around 398,774 MWh/d on April 19 versus 420,099 MWh/d the day prior, the data showed.
Russian gas producer Gazprom said it continued to supply natural gas to Europe via Ukraine in line with requests from European consumers.
Flows to Germany through the Nord Stream 1 pipeline across the Baltic Sea were at 72,980,009 kWh/h on the morning of April 19, little changed from the previous 24 hours.
Eastbound gas flows increased via the Yamal-Europe pipeline from Germany to Poland, data from the Gascade pipeline operator showed.
The data showed physical exit flows at the Mallnow metering point on the German border rose to 6,199,090 kWh/h from 4,796,229 kWh/h earlier in the morning.
Recommended Reading
Venture Global Acquires Nine LNG-powered Vessels
2024-03-18 - Venture Global plans to deliver the vessels, which are currently under construction in South Korea, starting later this year.
Subal: Pockets of Growth Balance Fears of Slowdown
2024-01-11 - U.S. midstream and energy infrastructure has a mixed outlook for 2024, with a possible loss in demand and stronger focus on renewables offset by solid oil prices and a healthy midstream industry with pockets of growth.
Apollo Buys Out New Fortress Energy’s 20% Stake in LNG Firm Energos
2024-02-15 - New Fortress Energy will sell its 20% stake in Energos Infrastructure, created by the company and Apollo, but maintain charters with LNG vessels.
FERC Approves ONEOK Pipeline Segment Connecting Permian to Mexico
2024-02-16 - ONEOK’s Saguaro Connector Pipeline will transport U.S. gas to Mexico Pacific’s Saguaro LNG project.
EQT CEO: Biden's LNG Pause Mirrors Midstream ‘Playbook’ of Delay, Doubt
2024-02-06 - At a Congressional hearing, EQT CEO Toby Rice blasted the Biden administration and said the same tactics used to stifle pipeline construction—by introducing delays and uncertainty—appear to be behind President Joe Biden’s pause on LNG terminal permitting.