
(Source: Shutterstock.com)
Reset Energy will design a 250-MMscf/d nitrogen rejection unit in the Permian Basin for an unnamed midstream operator to remove nitrogen for a residue gas product, the gas processing solutions provider said March 4.
Reset said its nitrogen rejection solution will increase the value of the feed gas for the operator. The technology uses cryogenic distillation to separate the nitrogen from hydrocarbon streams using a combination of compression, distillation and multi-pass heat exchanger systems.
The nitrogen rejection equipment will be installed at a large-scale facility in the Permian.
Reset said its technology also emits minimal levels of methane.
"In selecting Reset Energy for this project, the midstream operator demonstrated their confidence in our ability to design flexible and highly customizable nitrogen rejection solutions," said Reset Energy CEO Chris Villegas. "We are proud to support their commitment to deliver high-quality natural gas while also contributing to their methane emission reduction efforts."
Recommended Reading
Improving Gas Macro Heightens M&A Interest in Haynesville, Midcon
2025-03-24 - Buyer interest for Haynesville gas inventory is strong, according to Jefferies and Stephens M&A experts. But with little running room left in the Haynesville, buyers are searching other gassy basins.
Post Oak’s Permian Roots Grow Deeper with $480MM in ’24 Minerals M&A
2025-05-07 - Post Oak Energy Capital was early to invest in M&R as a standalone asset class. Today, it manages 85,000 net royalty acres.
Exxon Sits on Undeveloped Haynesville Assets as Peers Jockey for Inventory
2025-04-09 - Exxon Mobil still quietly holds hundreds of locations in the Haynesville Shale, where buyer interest is strong and inventory is scarce.
Expand: 2%-Plus Gas OFS Deflation if Permian Cuts Rigs, Frac Crews
2025-04-30 - Reduced prices for goods and services may come as Permian Basin and other oil-focused E&Ps drop rigs and frac crews at $60 oil, Expand Energy executives said.
Operators Look to the Haynesville on Forecasts for Another 30 Bcf/d in NatGas Demand
2025-03-01 - Futures are up, but extra Haynesville Bcfs are being kept in the ground for now, while operators wait to see the Henry Hub prices. A more than $3.50 strip is required, and as much as $5 is preferred.
Comments
Add new comment
This conversation is moderated according to Hart Energy community rules. Please read the rules before joining the discussion. If you’re experiencing any technical problems, please contact our customer care team.