ConocoPhillips Co. has retained TenOaks Energy Advisors for the sale of certain operated and non-operated properties located in the Delaware Basin. The package includes a net production of 1,600 boe/d.
Opportunity highlights:
- Premier Delaware Basin footprint in Lea County, New Mexico
- 5,970 gross / 4,100 net acres with majority operational control (100% HBP)
- NTM Avg. Net Production: ~1,600 Boepd / NTM OCF: $30MM
- 2024E OCF: $63MM with an exit rate of ~4,500 Boepd (net) assuming a 1-rig program
- High return drilling program with exceptional IRRs and type curves reaching >1,100 MBoe with ample well control.
- 132 gross / 50 net drilling locations remaining with an average lateral length of ~8,750'
- Significant production from the 1BS, 2BS, 3BS/WCA on and immediately offset the position / additional targets include the Middle WC and Penn Shale
Bids are due Nov.9. For complete due diligence, please visit tenoaksenergyadvisors.com or email B.J. Brandenberger, partner, at bjbrandenberger@tenoaksadvisors.com or Forrest Salge, vice president, at forrest.salge@tenoaksadvisors.com
Recommended Reading
Chevron Launches New Hydraulic Fluid for Marine, Construction Use
2024-09-10 - Chevron said its Clarity Bio EliteSyn AW hydraulic fluid meets or exceeds the biodegradation, toxicity and bioaccumulation limits set by government regulations.
No Good Vibrations: Neo Oiltools’ Solution to Vibrational Drilling Problems
2024-09-10 - Vibrations cause plenty of costly issues when drilling downhole, but Neo Oiltool’s NeoTork combats these issues, enhancing efficiency and reducing costs.
Adionics Unveils Lithium Extraction Technology For Recycled Batteries
2024-09-09 - The Paris-based company said its liquid-liquid process achieved lithium recoveries of up to 98% across a range of brine concentrations.
BP to Use Palantir Software to Improve AI in Operations
2024-09-09 - BP and Palantir have agreed to a five-year strategic relationship in which Palantir’s AIP software will use large language models to improve BP operations.
TGS Awarded 2D Survey in the Sumatra Basin
2024-09-09 - TGS’ Sumatra Basin seismic acquisition is expected to be completed by the end of 2024.
Comments
Add new comment
This conversation is moderated according to Hart Energy community rules. Please read the rules before joining the discussion. If you’re experiencing any technical problems, please contact our customer care team.