The following information is provided by EnergyNet. All inquiries on the following listings should be directed to EnergyNet. Hart Energy is not a brokerage firm and does not endorse or facilitate any transactions.
Solarstone Ltd. has retained EnergyNet for the sale of a late-stage development 30 megawatt (MW) solar PV and 60 MW/180 megawatt-hour battery energy storage system (BESS) project in Kit Carson County, Colorado. The lot# 119229 package includes a lease rate of $425 per acre utilized, with a 2% annual escalation.

Opportunity Highlights:
- The Kit Carson Solar I Project is in late-stage development and features a 30 MW solar photovoltaic (PV) system and a 60 MW / 180 MWh battery energy storage system (BESS). The project area encompasses 400 acres within the Eastern Colorado Energy Center, located in Kit Carson County, Colorado.
Overview
- Location: Kit Carson County, Colorado (39.5374, -102.5969)
- Technology: 30 MW solar PV and 60 MW / 180 MWh BESS
- COD: Q1 2026
- Interconnection: 90 MW capacity at POI with ERIS designation
- Environmental Site Assessment: Completed; no significant findings
- Cost Estimates: Received and available for PV and BESS materials
- Interconnection Request: Submitted to Tri-State in 2022
- DISIS: Completed by Tri-State
- Interconnection Agreement: Negotiations scheduled for 09/2024
Site Control
- Lease Option: Executed in Q2 2022
- Option Term: 5 years
- Lease Term: 20 years, with two 10-year extensions
- Lease Rate: $425 per acre utilized, with a 2% annual escalation
PVsyst Report
- Annual Production: 82,339,271 kWh/year
- Performance Ratio (PR): 92.41%
Bids are due Aug. 29 at 4:00 p.m. CDT. For complete due diligence, please visit energynet.com or email Chris Atherton, CEO and president, at Chris.Atherton@energynet.com; Gus Rivero, chief ventures officer, at Gus.Rivero@energynet.com; or Anastasia Brooking, vice president of strategic development, at Anastasia.Brooking@energynet.com.
Recommended Reading
Zeo Energy to Acquire Solar Power Producer Heliogen in $10MM Deal
2025-05-29 - The transaction is expected to close in third-quarter 2025, subject to the approval of Heliogen’s stockholders as well as customary closing and other conditions.
Stonepeak Acquires $340MM Stake in Repsol’s Solar, Storage Portfolio
2025-04-29 - Repsol’s 777-megawatt portfolio includes the Frye solar project in Texas and the Jicarilla solar and storage complex in New Mexico, Stonepeak says.
ENGIE Adds 900 MW Solar, Storage to Portfolio from Ares Management
2025-03-25 - The addition brings ENGIE North America and Ares Management’s partnership to 3.7 gigawatts of investment in U.S. generation.
TotalEnergies Grows Renewables Portfolio with Project Acquisitions
2025-04-03 - TotalEnergies has entered into deals with RES, VSB Group and SN Power for assets in North America, Africa and Europe.
EGCO Acquires 49% Stake in Apex Clean Energy’s Pinnacle II Portfolio
2025-04-08 - Electric Generating Public Co. is acquiring ownership interest in Apex Clean Energy’s Pinnacle II portfolio, which consists of two projects with a combined capacity of 251 megawatts.
Comments
Add new comment
This conversation is moderated according to Hart Energy community rules. Please read the rules before joining the discussion. If you’re experiencing any technical problems, please contact our customer care team.