The following information is provided by EnergyNet. All inquiries on the following listings should be directed to EnergyNet. Hart Energy is not a brokerage firm and does not endorse or facilitate any transactions.
Solarstone Ltd. has retained EnergyNet for the sale of a late-stage development 30 megawatt (MW) solar PV and 60 MW/180 megawatt-hour battery energy storage system (BESS) project in Kit Carson County, Colorado. The lot# 119229 package includes a lease rate of $425 per acre utilized, with a 2% annual escalation.
Opportunity Highlights:
- The Kit Carson Solar I Project is in late-stage development and features a 30 MW solar photovoltaic (PV) system and a 60 MW / 180 MWh battery energy storage system (BESS). The project area encompasses 400 acres within the Eastern Colorado Energy Center, located in Kit Carson County, Colorado.
Overview
- Location: Kit Carson County, Colorado (39.5374, -102.5969)
- Technology: 30 MW solar PV and 60 MW / 180 MWh BESS
- COD: Q1 2026
- Interconnection: 90 MW capacity at POI with ERIS designation
- Environmental Site Assessment: Completed; no significant findings
- Cost Estimates: Received and available for PV and BESS materials
- Interconnection Request: Submitted to Tri-State in 2022
- DISIS: Completed by Tri-State
- Interconnection Agreement: Negotiations scheduled for 09/2024
Site Control
- Lease Option: Executed in Q2 2022
- Option Term: 5 years
- Lease Term: 20 years, with two 10-year extensions
- Lease Rate: $425 per acre utilized, with a 2% annual escalation
PVsyst Report
- Annual Production: 82,339,271 kWh/year
- Performance Ratio (PR): 92.41%
Bids are due Aug. 29 at 4:00 p.m. CDT. For complete due diligence, please visit energynet.com or email Chris Atherton, CEO and president, at Chris.Atherton@energynet.com; Gus Rivero, chief ventures officer, at Gus.Rivero@energynet.com; or Anastasia Brooking, vice president of strategic development, at Anastasia.Brooking@energynet.com.
Recommended Reading
Exclusive: EQT Set to Benefit from AI Growth in Appalachia
2024-10-01 - An ample supply of natural gas is available in Appalachia, making it a perfect place for AI data centers to settle down and take root. EQT plans on pouncing on the opportunity, said Will Jordan, EQT's executive vice president and general counsel, at Gastech 2024.
Air Products Closes Sale of LNG Business to Honeywell for $1.81B
2024-10-01 - Air Products’ sale of its LNG process technology and equipment business to Honeywell will allow the company to focus on its industrial gases and hydrogen businesses.
Oil Prices Jump 4% on Reports of Iran Preparing to Attack Israel
2024-10-01 - An Israeli attack on Iranian oil production or export facilities could cause a material disruption, potentially more than a 1 MMbbl/d.
Warmer-than-average US Temps to Pressure Gas Demand Side
2024-09-30 - Higher U.S. temperatures are expected to pressure gas demand for gas-fired electricity, according to a report from Rystad Energy.
New Fortress ships Mexico's first LNG cargo for export
2024-09-30 - U.S. energy infrastructure company New Fortress Energy on Sept. 30 shipped the first export of LNG from Mexico, following the inauguration of output at its floating facility off the country's coast, the company said.
Comments
Add new comment
This conversation is moderated according to Hart Energy community rules. Please read the rules before joining the discussion. If you’re experiencing any technical problems, please contact our customer care team.