Solarstone Ltd. has retained EnergyNet for the sale of a late-stage development 30 megawatt (MW) solar PV and 60 MW/180 megawatt-hour battery energy storage system (BESS) project in Kit Carson County, Colorado. The lot# 119229 package includes a lease rate of $425 per acre utilized, with a 2% annual escalation.

Opportunity Highlights:
- The Kit Carson Solar I Project is in late-stage development and features a 30 MW solar photovoltaic (PV) system and a 60 MW / 180 MWh battery energy storage system (BESS). The project area encompasses 400 acres within the Eastern Colorado Energy Center, located in Kit Carson County, Colorado.
Overview
- Location: Kit Carson County, Colorado (39.5374, -102.5969)
- Technology: 30 MW solar PV and 60 MW / 180 MWh BESS
- COD: Q1 2026
- Interconnection: 90 MW capacity at POI with ERIS designation
- Environmental Site Assessment: Completed; no significant findings
- Cost Estimates: Received and available for PV and BESS materials
- Interconnection Request: Submitted to Tri-State in 2022
- DISIS: Completed by Tri-State
- Interconnection Agreement: Negotiations scheduled for 09/2024
Site Control
- Lease Option: Executed in Q2 2022
- Option Term: 5 years
- Lease Term: 20 years, with two 10-year extensions
- Lease Rate: $425 per acre utilized, with a 2% annual escalation
PVsyst Report
- Annual Production: 82,339,271 kWh/year
- Performance Ratio (PR): 92.41%
Bids are due Aug. 29 at 4:00 p.m. CDT. For complete due diligence, please visit energynet.com or email Chris Atherton, CEO and president, at Chris.Atherton@energynet.com; Gus Rivero, chief ventures officer, at Gus.Rivero@energynet.com; or Anastasia Brooking, vice president of strategic development, at Anastasia.Brooking@energynet.com.
Recommended Reading
XGS’ Geothermal Tech Unfazed by Poor Permeability or Low Water
2025-06-25 - Unlike other enhanced geothermal systems, XGS Energy’s technology does not rely on fracturing to access heat. Plus, it is designed to use zero operating water.
Blue Hydrogen’s Carbon Management Needs Policy, Scale to be Realized
2025-04-18 - Expectations are high for blue hydrogen’s carbon capture rates, but some companies have work to do to hit the mark.
Energy Transition in Motion (Week of May 9, 2025)
2025-05-09 - Here is a look at some of this week’s renewable energy news, including a low-carbon deal between Exxon Mobil and Marubeni.
DNV: Turning Point Arrives for CCS
2025-06-15 - The Northern Lights joint venture and Occidental’s 1PointFive are among the companies moving CCS projects forward.
Is It Time for a Hydrogen Rebrand in the US?
2025-06-26 - The hydrogen production 45V tax credit might be on its death bed, but industry hope remains as thoughts turn to next steps to grow the sector under the Trump administration.
Comments
Add new comment
This conversation is moderated according to Hart Energy community rules. Please read the rules before joining the discussion. If you’re experiencing any technical problems, please contact our customer care team.