The following information is provided by EnergyNet. All inquiries on the following listings should be directed to EnergyNet. Hart Energy is not a brokerage firm and does not endorse or facilitate any transactions.
Solarstone Ltd. has retained EnergyNet for the sale of a late-stage development 30 megawatt (MW) solar PV and 60 MW/180 megawatt-hour battery energy storage system (BESS) project in Kit Carson County, Colorado. The lot# 119229 package includes a lease rate of $425 per acre utilized, with a 2% annual escalation.

Opportunity Highlights:
- The Kit Carson Solar I Project is in late-stage development and features a 30 MW solar photovoltaic (PV) system and a 60 MW / 180 MWh battery energy storage system (BESS). The project area encompasses 400 acres within the Eastern Colorado Energy Center, located in Kit Carson County, Colorado.
Overview
- Location: Kit Carson County, Colorado (39.5374, -102.5969)
- Technology: 30 MW solar PV and 60 MW / 180 MWh BESS
- COD: Q1 2026
- Interconnection: 90 MW capacity at POI with ERIS designation
- Environmental Site Assessment: Completed; no significant findings
- Cost Estimates: Received and available for PV and BESS materials
- Interconnection Request: Submitted to Tri-State in 2022
- DISIS: Completed by Tri-State
- Interconnection Agreement: Negotiations scheduled for 09/2024
Site Control
- Lease Option: Executed in Q2 2022
- Option Term: 5 years
- Lease Term: 20 years, with two 10-year extensions
- Lease Rate: $425 per acre utilized, with a 2% annual escalation
PVsyst Report
- Annual Production: 82,339,271 kWh/year
- Performance Ratio (PR): 92.41%
Bids are due Aug. 29 at 4:00 p.m. CDT. For complete due diligence, please visit energynet.com or email Chris Atherton, CEO and president, at Chris.Atherton@energynet.com; Gus Rivero, chief ventures officer, at Gus.Rivero@energynet.com; or Anastasia Brooking, vice president of strategic development, at Anastasia.Brooking@energynet.com.
Recommended Reading
Electron Gold Rush: ‘White Hot’ Power Market Shifts into High Gear
2025-03-06 - Tech companies are scrambling for electrons as AI infrastructure comes online and gas and midstream companies need to be ready, Energy Exemplar CEO says.
Baker Hughes to Supply Multi-Fuel Gas Tech to TURBINE-X
2025-03-17 - Baker Hughes will provide TURBINE-X with its NovaLT gas turbine is capable of running on different fuels including natural gas, various blends of natural gas and hydrogen.
Diamondback in Talks to Build Permian NatGas Power for Data Centers
2025-02-26 - With ample gas production and surface acreage, Diamondback Energy is working to lure power producers and data center builders into the Permian Basin.
BYOP (Bring Your Own Power): The Great AI Race for Electrons
2025-01-06 - Data-center developers, scrambling to secure 24/7 power, are calling on U.S. producers to meet demand as natgas offers the quickest way to get more electrons into the taps.
New Era Helium, Sharon AI Cement Permian Basin Data Center JV
2025-01-21 - New Era Helium and Sharon AI have created a JV, Texas Critical Data Centers, and are working on offtake gas supply agreements and site selection.
Comments
Add new comment