Building Momentum In The Stack: Devon Energy's five-well-per-section spacing pilot in the over-pressured Upper Meramec window came online with 1,400 boe/d per well, 60% light oil, and indications were that even tighter spacing may be possible. Here's a look at its leasehold, results and exploitation forecast for surfacing the Stack's resources.

  • Tony Vaughn, COO of Devon Energy Corp.