Baseline Energy Services LP, an oilfield services provider of mobile power solutions, said it opened a new facility in the Uinta Basin to support the region’s mobile power generator fleet with a range of maintenance and repair services, according to a Sept. 24 press release.
The facility, located in Roosevelt, Utah, will be equipped with a gantry crane, three work bays, a 600-kilowatt (kW) load bank and a 1,000-gallon propane tank, the Fort Worth, Texas-based servicer said.
Baseline said forklifts, a welding machine and an air compressor will supply all work bays, and a power washer will contribute to the maintenance of the company’s three mobile power generators with capacities of 175 kW, 235 kW and 350 kW.
Recommended Reading
The Midland—Oxy’s Second Growth Engine—Already Purring
2024-12-04 - From 18,000-ft laterals to new exploration in the Emma Barnett, Thaimar Ramirez, president and general manager of Oxy’s Midland Basin Business Unit, detailed the integration of its $12 billion CrownRock takeover.
Shale Players Hit Sweet Spot with Higher Volumes, Lower Costs: EIA
2024-12-12 - Over the past two years, publicly traded E&Ps have generally increased production, with oil volumes in second-quarter 2024 averaging 3.9 MMbbl/d while production costs have fallen by $11/boe since 2019.
Exclusive: Harold Hamm’s Top Oil, Gas Goals After Trump Victory
2024-11-15 - Continental Resources Chairman Harold Hamm helped raise millions of dollars for Donald Trump’s campaign—and he’s got a laundry list of energy goals for the next administration to tackle.
Langford Enters Midland Basin with Murchison Oil and Gas Deal
2025-01-14 - Langford Energy Partners closed on an acquisition of 8,000 acres in the Midland Basin from Murchison Oil and Gas LLC.
Major Interest: Chevron, Shell Join Vaca Muerta Crude Pipe Project
2025-01-20 - Oil producers are pumping record levels from Argentina’s Vaca Muerta shale. Chevron and Shell have backed a new crude pipeline project that aims to boost takeaway capacity—and exports—of Vaca Muerta oil.
Comments
Add new comment
This conversation is moderated according to Hart Energy community rules. Please read the rules before joining the discussion. If you’re experiencing any technical problems, please contact our customer care team.