Two Mississippi Lime Wells Completed in Union City Field

Drilling Activity Details

Locations

Canadian
OK
United States

Operators
Post Date
Shore Type
Well Name
#2MXH Battleship 1-12-10-7, #3MXH Battleship 1-12-10-7
Geo Coordinate

Drilling Activity Summary

Description

Results were announced on two Canadian County, Okla., Mississippi Lime discoveries by Citizen Energy III. The wells were drilled from a Union City Field pad in Section 36-11n-7w. The #2MXH Battleship 1-12-10-7was drilled to 20,650 ft, 10,420 ft true vertical, and flowed 343 bbl of 52° API condensate, 2.485 MMcf of gas: 773 bbl of water per day from a perforated zone at 10,500-20,507 ft. Tested on a 24/64-inch choke, the flowing tubing pressure was 1,929 psi. The #3MXH Battleship 1-12-10-7 was drilled to 20,961 ft, 10,445 ft true vertical, and produces 407 bbl of 54° API condensate with 2.899 MMcf of gas and 1,039 bbl of water per day from perforations at 10,816-20,856 ft. Gauged on a 28/64-inch choke, the flowing tubing pressure was 1,711 psi.