Two Martin Field-Haynesville Wells Planned In Red River Parish, La.
Drilling Activity Details
LA
United States
Drilling Activity Summary
Description
GEP Haynesville LLC announced plans to drill its first two Haynesville Shale tests in eastern the Martin Field portions on Red River Parish, La. The company’s #1-Alt Bollingham 8-7HC and #2-Alt Bollingham 18-7HC will be drilled from a common pad in Section 19-13n-8w and will bottom about 1.5 miles to the north in Section 7. The #1-Alt Bollingham 8-7HC has a planned depth of 20,600 ft (15,100 ft true vertical). The #2-Alt Bollingham 18-7HC has a planned depth of 20,000 ft (14,000 ft true vertical). GEP Haynesville is based in The Woodlands, Texas.
GEP Haynesville LLC announced plans to drill its first two Haynesville Shale tests in eastern the Martin Field portions on Red River Parish, La. The company’s #1-Alt Bollingham 8-7HC and #2-Alt Bollingham 18-7HC will be drilled from a common pad in Section 19-13n-8w and will bottom about 1.5 miles to the north in Section 7. The #1-Alt Bollingham 8-7HC has a planned depth of 20,600 ft (15,100 ft true vertical). The #2-Alt Bollingham 18-7HC has a planned depth of 20,000 ft (14,000 ft true vertical). GEP Haynesville is based in The Woodlands, Texas.