Ring Energy to Drill Three Vertical San Andres Tests

Drilling Activity Details

Locations

United States

Operators
Plays
Post Date
Well Name
#1 Ve, #1 Villi, #1 Vor
Geo Coordinate

Drilling Activity Summary

Description

Midland, Texas-based Ring Energy Inc. has received permits to drill three vertical San Andres tests in the Midland Basin n Gaines County (RRC Dist. 8A.), Texas. According to IHS Markit, #1 Ve is on a 640-acre lease in Section 239, Block G, WT RR Co Survey, A-307. The proposed total depth is 7,000 ft and the wildcat could be completed in the San Andres, Wasson or ODC Field. About 9 miles to the south, #1 Villi will be drilled in Section 121, Block G, WT RR Co Survey, A-248. The 7,000-ft test will target San Andres in G-M-K West Field. About 2.5 miles further to the southeast is the proposed #1 Vor in Section 93, Block G, WT RR Co Survey, A-234. The wildcat will also be drilled to 7,000 ft with a San Andres target in G-M-K West Field. The #1 Vor is generally south of G-M-K West Field, a San Andres oil pool that has produced almost 2 MMbbl of crude and 390.8 MMcf of gas since 1998.