Miocene Workover in Terrebonne Parish, La., Produces 7.332 MMcf of Gas, 351 bbl of Condensate Per Day

Drilling Activity Details

Locations

Terrebonne
LA
United States

Operators
Post Date
Shore Type
Well Name
#1 Louisiana Land & Exploration
Geo Coordinate

Drilling Activity Summary

Description

Castex Energy recompleted a King Lake Field well in western Terrebonne Parish, La. According to IHS Markit, the Miocene workover, #1 Louisiana Land & Exploration, was tested flowing 7.322 MMcf of gas and 351 bbl of 51.6-degree-gravity condensate per day from Textularia L (Miocene) at 17,066-17,114 ft. Gauged on an 11/64-in. choke, the flowing tubing pressure was 6,060 psi, and the shut-in tub-ng pressure was 6,426 psi. The 18,071-ft directional well was plugged back to 17,135 ft. The venture was initially completed by the Houston-based company in 2018, and it flowed 6.608 MMcf of gas daily from Textularia L at 17,164-17,229 ft. The discovery is in irregular Section 35-20s-14e.