Marathon Oil Announces Results from Two Eagleville Field Completions

Drilling Activity Details

Locations

Karnes
TX
United States

Operators
Post Date
Shore Type
Well Name
#1H Turnbull Unit E, #2H Turnbull Unit E
Geo Coordinate

Drilling Activity Summary

Description

Marathon Oil Corp. announced results from two Eagleville Field wells that were completed in Karnes County (RRC Dist. 2), Texas. The discoveries were drilled from a surface location in Henry Brown Survey, S A-32. The #1H Turnbull Unit E was drilled to 18,682 ft (11,724 ft true vertical). It was tested flowing 2,4652 bbl of 43-degree-gravity oil, 2.595 MMcf of gas and 1,241 bbl of water daily from a perforated zone at 11,412-18,562 ft. Gauged on a 28/64-in. choke, the flowing casing pressure was 3,180 psi. The offsetting #2H Turnbull Unit E was drilled to 18,652 ft (11,697 ft true vertical). It was tested flowing 2,333 bbl of 49-degree-gravity oil, 2.11 MMcf of gas and 1,741 bbl of water per day from perforations at 11,474-18,536 ft. It was tested on a 28/64-in. choke, and the flowing casing pressure was 2,984 psi.