Hackberry Completion In Allen Parish, La.
Drilling Activity Details
Locations
Allen
LA
United States
Operators
Plays
Post Date
Shore Type
Well Name
#1 Ranell Rae Tims
Geo Coordinate
Drilling Activity Summary
Description
A Hackberry oil well in the Allen Parish portion of Louisiana’s Topsy Field was completed by Zachary Exploration. The #1 Ranell Rae Tims flowed 111 bbl of 43.5-degree-gravity crude, 106 Mcf of gas and 5 bbl of water per day. Production is from perforations at 7,395-98 ft. Tested on a 7/64-in. choke, the flowing tubing pressure was 1,373 psi and shut-in tubing pressure was 1,410 psi. It was drilled to 8,000 ft well and is in Section 20-7s-7w.
Description
A Hackberry oil well in the Allen Parish portion of Louisiana’s Topsy Field was completed by Zachary Exploration. The #1 Ranell Rae Tims flowed 111 bbl of 43.5-degree-gravity crude, 106 Mcf of gas and 5 bbl of water per day. Production is from perforations at 7,395-98 ft. Tested on a 7/64-in. choke, the flowing tubing pressure was 1,373 psi and shut-in tubing pressure was 1,410 psi. It was drilled to 8,000 ft well and is in Section 20-7s-7w.