Frio Completion Reported Near Tres Palacios Bay

Drilling Activity Details

Locations

Matagorda
TX
United States

Operators
Post Date
Shore Type
Well Name
#2 Green Unit 1
Geo Coordinate

Drilling Activity Summary

Description

Hilcorp Energy Co. has completed a Frio well in Matagorda County (RRC Dist. 3), near Tres Palacios Bay. The #2 Green Unit 1 initially flowed 12.94 MMcf of gas, 380 bbl of 47.7-degree-gravity crude and 30 bbl of water per day from Textularia mississippiens is at 14,120-86 ft. Gauged on a 26/64-in. choke, the flowing casing pressure was 8,428 psi. The directional sidetrack was drilled to 15,121 ft and the true vertical depth is 14,982 ft. The venture is on a 640-acre Upper Texas Coast lease in Section 19, Lewis DeMoss Survey, A-145. The original hole was abandoned at 15,244 ft. Hilcorp is based in Houston.