Eagle Ford Discovery Flowing 890 bo, 2.8 MMcf Of Gas Per Day

Drilling Activity Details

Locations

TX
United States

Plays
Post Date
Shore Type
Well Name
#1H Wildcat B
Geo Coordinate

Drilling Activity Summary

Description

A horizontal Eagle Ford Shale completion by Fort Worth, Texas-based Lonestar Resources Inc. is producing more than 2 Mbbl of oil equivalent per day. The company reported that its #1H Wildcat B in Brazos County (RRC Dist. 3), Texas, recently established a 30-day production rate of 890 bbl of crude per day per day(42%), 764 bbl of NGL (36%) per day and 2.8 MMcf of gas (22%) per day. On a combined basis, the well’s 30-day production rate averaged 2.123 Mbbl of oil equivalent per day. It is on a 1,160-acre lease in Thomas Caruthers Survey, A-9. The Giddings Field well was fracture stimulated over a perforated interval at 11,652-19,818 ft. It was drilled to 19,818 ft with a true vertical depth of 10,833 ft.