Dual-lateral Georgetown Completion Reported By CML Exploration
Drilling Activity Details
Zavala
TX
United States
Drilling Activity Summary
Description
CML Exploration LLC completed a dual-lateral oil well in Pena Creek Field. Located in Zavala County (RRC Dist. 1), Texas, #1 Palm flowed 164 bbl of crude, 1.877 MMcf of gas and 34 bbl of water from openhole zones in Georgetown at 7,518-17,535 ft and 7,092-19,275 ft. Tested on a 16/64-in. choke, the flowing tubing pressure was 2,550. The well is on a 704-acre lease in Narciso Aguirre Survey, A-3. One leg bottomed 2 miles southeast at 17,535 ft (7,039 ft true vertical depth), with a second lateral bottoming about 2.5 miles east-southeast at 19,330 ft (6,892 ft true vertical). CML’s headquarters are in Kingwood, Texas.
CML Exploration LLC completed a dual-lateral oil well in Pena Creek Field. Located in Zavala County (RRC Dist. 1), Texas, #1 Palm flowed 164 bbl of crude, 1.877 MMcf of gas and 34 bbl of water from openhole zones in Georgetown at 7,518-17,535 ft and 7,092-19,275 ft. Tested on a 16/64-in. choke, the flowing tubing pressure was 2,550. The well is on a 704-acre lease in Narciso Aguirre Survey, A-3. One leg bottomed 2 miles southeast at 17,535 ft (7,039 ft true vertical depth), with a second lateral bottoming about 2.5 miles east-southeast at 19,330 ft (6,892 ft true vertical). CML’s headquarters are in Kingwood, Texas.