Directional Rusty Field Well Hits 146 ft of Net Pay in Seven Intervals

Drilling Activity Details

Locations

Matagorda
TX
United States

Operators
Post Date
Shore Type
Well Name
#2 Green Unit 1
Geo Coordinate

Drilling Activity Summary

Description

Hilcorp Energy announced results from a directional Rusty Field completion in Matagorda County (RRC Dist. 3), Texas, in Section 19, Lewis Demoss Survey, A-145. The #2 Green Unit 1 was drilled to 15,121 ft, 14,982 true vertical, after being sidetracked from #1 Green Unit at 11,676 ft to evaluate Tex Miss 1 and Tex Miss 2/3 reservoirs. Analysis indicates 146 ft of net pay over seven sand intervals. Depending upon porosity and water saturation cutoffs applied, there is potential for up to 175 ft of additional net pay. The #1 Green Unit, which was producing 14.1 MMcfe per day (16% condensate) was shut in during drilling but was later opened for production. Hilcorp is based in Houston.