Cherokee Completion In Ellis County, Okla., Flows 470 bbl Of Oil, 3.075 MMcf Of Gas Per Day
Drilling Activity Details
Locations
Ellis
OK
United States
Operators
Plays
Post Date
Shore Type
Well Name
#36-25 1H Weston
Geo Coordinate
Drilling Activity Summary
Description
A Cherokee completion by Valpoint Operating LLC was tested flowing 470 bbl of 44-degree-gravity oil, 3.075 MMcf of gas and 2.93 Mbbl of water per day. The #36-25 1H Weston is in Section 1-17n-23w, Ellis County, Okla., and is in Peek South Field. It was drilled to 18,450 ft, 9,940 ft true vertical. Production is from acidized and fractured perforations at 10,347-18,361 ft. Valpoint’s headquarters are in Amarillo.
Description
A Cherokee completion by Valpoint Operating LLC was tested flowing 470 bbl of 44-degree-gravity oil, 3.075 MMcf of gas and 2.93 Mbbl of water per day. The #36-25 1H Weston is in Section 1-17n-23w, Ellis County, Okla., and is in Peek South Field. It was drilled to 18,450 ft, 9,940 ft true vertical. Production is from acidized and fractured perforations at 10,347-18,361 ft. Valpoint’s headquarters are in Amarillo.