Cabot Oil & Gas Announces Results From Six Marcellus Producers In Susquehanna County, Pa.

Drilling Activity Details

Locations

Susquehanna
PA
United States

Plays
Post Date
Shore Type
Well Name
#1H Adams J, #2H Adams J, #3H Adams J, #5H Adams
Geo Coordinate

Drilling Activity Summary

Description

Cabot Oil & Gas Corp. completed six Marcellus Shale wells from a pad in Susquehanna County, Pa. The Lenox Field wells are in Section 8, Harford 7.5 Quad, Harford Township. The #1H Adams J was drilled to 19,294 ft, 7,354 ft true vertical, and flowed 31 MMcf of gas per day after 51-stage fracturing. Production is from perforations at 8,399-19,224 ft. The #2H Adams J was drilled to 19,976 ft, 7,174 ft true vertical. It flowed 12 MMcf of gas per day after 58-stage fracturing. Production is from perforations at 8,877-19,886 ft. The #3H Adams J was drilled to 18,776 ft, 7,412 ft true vertical. It flowed 31.7 MMcf of gas per day after 50-stage fracturing. Production is from perforations at 8,901-18,706 ft. The #5H Adams J was drilled to 18,406 ft, 7,420 ft true vertical, and flowed 26.4 MMcf of gas per day after 51-stage fracturing. Production is from perforations at 8,233-18,333 ft. The #7H Adams J was drilled to 12,509 ft, 7,186 ft true vertical, and was tested flowing 16.7 MMcf of gas per day after 23-stage fracturing. Production is from perforations at 7,837-12,443 ft. The #8H Adams J was drilled to 13,617 ft, 7,203 ft true vertical, and produced 12.5 MMcf of gas per day after 30-stage fracturing. Production is from perforations at 7,723-13,551 ft. Cabot’s headquarters are in Houston.